Terna S.p.A.
Napoli (NA)

Construction design and works to replace the roof, the slab and other works in the CS Territorial Office and the AOT Napoli, located in Napoli at Via Aquileia 8.

Construction Manager: Eng. F. Cipriano



OTHER WORKS

Terna Rete Italia S.p.A.

Civil works for the construction of the new 150 kV electrical substation in
Capri Island (NA).

Construction Manager: Eng. N. Tessitore

+



+

Comune di Pisa

Le Piagge (PI)
+

Terna Rete Italia S.p.A.

Villafranca Tirrena (ME)
+

Terna Rete Italia S.p.A.

Sant’Antonio (BZ)